Before setup
Step 1 (0:29)
Unbox it
Step 2 (1:15)
Connect the copper
Step 3 (0:19)
Fittings
Step 4 (0:26)
Install new waste
Step 5 (0.49)
Connect pipes
Step 6 (2:10)
Position and adjust legs
Step 7 (1:09)
Connect cold feed
Step 8 (0:37)
Connect outlet
Step 9 (0:36)
Check connections
Step 10 (0:22)
Connect waste
Step 11 (1:10)